Server Application Solutions – Don’t Let Spreadsheets Hold Your Business Back

The problems and limitations of spreadsheet-based systems are well documented. That’s why we at Denizon have come up with ways to give you freedom from these UDAs (User Developed Applications). With the server application solutions we offer, your IT and financial system can be:

Totally devoid of spreadsheet risks

By getting rid of spreadsheets, you also get rid of broken links, incomplete range selections, accidental deletion of cells, incorrect copy-pasting and other spreadsheet-related slip-ups.

In their place, we offer a faster but more robust and reliable centralised system. Errors are substantially minimised by built-in controls, while inconsistencies are avoided because changes made by one user are automatically reflected on the data delivered to others.

Built-in business-critical controls

Some solutions are designed to add control features on spreadsheets. We believe that such features can only be truly effective in today?s fast-paced and dynamic business environment if they are already inherent in the design of the IT solution; not something that’s merely added as an afterthought.

For one, while these band-aid solutions may succeed in adding controls, they don’t get rid of the slow, tedious, and time-consuming processes that accompany spreadsheet systems.

Less prone to fraud

Weak controls and the absence of reliable audit trails are two factors that encourage fraudsters to prey on spreadsheet systems.

With our server-based applications solutions, your data is protected by user-based access controls that allow users to see only the information that they’re supposed to see and modify data which they have been granted sufficient access rights to.

Our solutions also produce clear audit trails for painless tracking, viewing and searching of user-entered changes. This will enable you to pinpoint who changed what, as well as where and when the changes were made.

Ready for regulatory compliance and beyond

When better controls are enforced, financial reports become more reliable. That should give your company the edge it needs to easily comply with SOX as well as other regulations and, as a consequence, build stakeholder confidence.

And because our solutions can churn out accurate reports for regulation compliance at shorter turnaround times than spreadsheet systems, you end up saving more man-hours. That should give your team more time to innovate, analyse information and deliver goods or services to your customers faster.

Designed for agility

Let’s face it. Spreadsheets, which used to serve as nifty ad-hoc business tools, are no longer suitable for agile organisations. When faced with the demands of rapidly changing markets and dynamic environments, spreadsheets can instead slow a business down.

Multi-dimensional reports, dashboards, report filters, drill-downs, collaboration and automated reporting, budgeting and forecasting capabilities are needed for gaining insights and making fast critical decisions.

Sad to say, your trusty spreadsheet application is not designed to provide these features. Hence, it’s time to move on to the type of solutions that are.

Our solutions can transform your IT and financial systems and make them better-equipped to meet the demands of today?s rapidly changing economic environment. With features designed for agile businesses, our solutions can help you tackle change with ease.

Automatic consolidation eliminates errors and wasted time caused by tedious copy-pasting of data and linking of cells.

Better collaboration capabilities allows team members to bring their heads together for planning, budgeting and reporting even while on the go.

Mobility support enables users to input data or retrieve information through their wireless mobile devices.

Superior sharing features ensures that everyone is exactly on the same page and viewing real-time information.

Dashboards provide insightful information at-a-glance through KPIs, graphs and various metrics.

Drill-downs enable users to investigate unusual figures and gain a better understanding of the details that contribute to the big picture.

Easy to learn interfaces allow your organisation to cope with fast personnel turnaround or Mergers & Acquisitions.

More Spreadsheet Blogs


Spreadsheet Risks in Banks


Top 10 Disadvantages of Spreadsheets


Disadvantages of Spreadsheets – obstacles to compliance in the Healthcare Industry


How Internal Auditors can win the War against Spreadsheet Fraud


Spreadsheet Reporting – No Room in your company in an age of Business Intelligence


Still looking for a Way to Consolidate Excel Spreadsheets?


Disadvantages of Spreadsheets


Spreadsheet woes – ill equipped for an Agile Business Environment


Spreadsheet Fraud


Spreadsheet Woes – Limited features for easy adoption of a control framework


Spreadsheet woes – Burden in SOX Compliance and other Regulations


Spreadsheet Risk Issues


Server Application Solutions – Don’t let Spreadsheets hold your Business back


Why Spreadsheets can send the pillars of Solvency II crashing down

?

Advert-Book-UK

amazon.co.uk

?

Advert-Book-USA

amazon.com

Check our similar posts

Key Steps to Complying with ESOS

Energy Savings Opportunity Scheme has already been launched. In fact, it is by now in its initial phase. However, many businesses are still not aware of the new scheme, especially those who are covered by the qualifications for ESOS. To help them understand what they need to do in compliance to the energy efficiency strategy, here are key steps they can follow along the way.

Measure Overall Energy Consumption

The first step to complying with ESOS is to make an initial estimate of the business? energy consumption. This includes measuring the use of electricity, renewable energy, combustible fuels and all other forms of energy consumed whether in buildings, transports and industrial processes.

Three important factors to consider are the measurement units used, the reference period and quality of data. Energy units, such as MWh and GJ, or energy expenditure costs should be applied. Business enterprises should also do the initial measurement within a reference period of 12 months. Moreover, data collected should be verifiable at hand.

Identify Areas of Significant Energy Consumption

When the total energy consumption for all the activities and assets has already been estimated, it’s then time to identify what areas in the organisation comprise the significant portion of the overall energy usage. The areas recognised should cover at least 90% of the overall consumption. Meaning to say, ESOS participants have the chance to omit 10% of the energy consumption and instead focus on the 90%. This would ensure that subsequent energy audits will be cost-effective and proportionate.

Consider and Choose Compliance Routes

In order to comply with ESOS, qualified businesses should consider what compliance routes to take. These routes include taking series of energy audits, operating and implementing a certified ISO 50001 energy management system, acquiring Display Energy Certificates (DECs) and working with Green Deal assessments. Whichever route the business takes, one should maintain credible evidences, along with helpful documents, to certify their compliance.

Report the Compliance

Except when the large enterprise covers all the significant areas of energy consumption by means of ISO 50001 certification, one should appoint a lead assessor to supervise, conduct and review the organisation’s chosen ESOS compliance route. In this case, the approved assessments should then be signed off at board level to ensure that the conclusions and recommendations for energy savings are properly carried. To confirm their compliance, the business should submit a formal notification to the Environment Agency.

Because ESOS is not just an opportunity but also an obligation, it designated compliance bodies and gave them the authority to file civil penalties towards those who fail to comply with the scheme. Not only that, these appropriate authorities have the right to publish information about non-compliant enterprises including their name, details of non-compliance and corresponding penalty amount. Among these UK compliance bodies are Natural Resources Wales, Environment Agency in England, The Scottish Environment Protection Agency (SEPA) and Northern Ireland Environment Agency.

So, if you are covered with the ESOS qualifications, make sure to be informed. As the famous saying goes, ?Ignorance of the law excuses no one.? Likewise, awareness of ESOS is a responsibility every large business in UK should give importance to.

Contact Us

  • (+353)(0)1-443-3807 – IRL
  • (+44)(0)20-7193-9751 – UK
The Matrix Management Structure

Organizations exploit matrix management in various ways. A company, for instance, that operates globally uses it at larger scale by giving consistent products to various countries internationally. A business entity, having many products, does not assign its people to each product full-time but assign those to different ones on a part time basis, instead. And when it comes to delivering high quality and low cost products, companies overcome industry pressures with the help of many overseeing managers. In a rapidly changing environment, organizations respond quickly by sharing information through a matrix model.

Understanding the Matrix Management Structure

A basic understanding of matrix management starts with the three key roles and responsibilities that applies in the structure.

  • Matrix Leader ? The common person above all the matrix bosses is the matrix leader. He ensures that the balance of power is maintained in the entire organization by delegating decisions and promoting collaboration among the people.
  • Matrix Managers ? The managers cooperate with each other by defining the respective activities that they are responsible for.
  • Matrix Employees – The employees have lesser direct authority but has more responsibilities. They resolve differing demands from more than one matrix managers while they work things out upwards. Their loyalty must be dual and their relationships with managers must be maintained.

Characteristics of a Matrix Structure

Here are some features that define the matrix management structure:

  • Hybrid Structure ?The matrix structure is a mix of functional and project organization. Since it is a combination of these two, matrix management is hybrid in nature.
  • Functional Manager ? When it comes to the technical phases of the project, the functional manager assumes responsibility. The manager decides on how to get the project done, delegates the tasks to the subordinates and oversees the operational parts of the organization.
  • Project Manager ? The project manager has full authority in the administrative phases, including the physical and financial resources needed to complete the project. The responsibilities of a project manager comprise deciding on what to do, scheduling the work, coordinating the activities to diverse functions and evaluating over-all project performance.
  • Specialization ?As the functional managers concentrate on the technical factors, the project managers focus on administrative ones. Thus, in matrix management, there is specialization.
  • Challenge in Unity of Command ? Companies that employs matrix management usually experience a problem when it comes to the unity of command. This is largely due to the conflicting orders from the functional and project managers.

Types of Matrix Structure

The matrix management structure can be classified according to the level of power of the project manager. Here are three distinct types of matrix structures that are widely used by organizations.

  • Weak Matrix ? The project manager has limited authority and power as the functional manager controls the budget of the project. His role is only part-time and more like a coordinator.
  • Strong Matrix ? Here, the project manager has almost all the authority and power. He controls the budget, holds the full time administrative project management and has a full time role.
  • Balanced Matrix ? In this structure type, both the project and functional managers control the budget of the project. The authority and power is shared by the two as well. Although the project manager has a full time role, he only has a part time authority for the administrative staff to report under his leadership.

Successful companies of today venture more on enhancing the abilities, skills, behavior and performances of their managers than the pursuit of finding the best physical structure. Indeed, learning the fundamentals of the matrix structure is essential to maximize its efficiency. A senior executive pointed out that one of the challenges in matrix management is not more of building a structure but in creating the matrix to the mind of the managers. This comes to say that matrix management is not just about the structure, it is a frame in the mind.

Can you do away with the Project Initiation Meeting?

Project initiation meetings are often skipped to fast-track projects. Once a sponsor is found, organisations go straight to project planning and execution. But based on our own experience, holding a project initiation meeting can actually eliminate many issues that may crop up in the future and hence may speed things up instead in the long run.

It is in the project initiation meeting where your project objectives and scope are clarified and all stakeholders are brought to the same page. Project sponsors and stakeholders will have to know in a nutshell what is needed from them, what the possible risks are, what different resources are required, and so on. So that, when it’s time to proceed to the next phase, everyone is already in-sync.

So what are taken up in such a meeting? Perhaps an actual example can help. Sometime in the past, we set out to work on an eCommerce website project. After conducting the project initiation meeting, these were some of the things we were able to accomplish:

  • Identified deliverables e.g. site design, interface to payment system, etc.
  • Come up with the project phases
  • Agreed what should be in and out of scope
  • Defined the acceptance test criteria
  • Identified possible risks
  • Identified the possible training and documentation work needed
  • Established whether any analysis was required, e.g. as with regards to payment interfaces
  • Formulated disaster recovery plans
  • Defined roles and responsibilities
  • Drafted timelines and due dates

Aren’t these covered in project planning? If the project is a big one, the answer is no. In a large project, project planning is a much more exhaustive activity. In a project initiation meeting, only the basic framework is defined.

Some questions may still remain unanswered after a project initiation meeting, but at least you already know what answers you need to look for. In the example we gave earlier, we left the meeting knowing that we needed:

  • a list of all necessary hardware to estimate the costs
  • to identify possible dependencies we might have with third parties
  • to identify what software had to be bought and what skills we needed to hire

When it was time to proceed to project planning, everyone involved already knew what direction we were taking. In effect, by not skipping the project initiation meeting, we were able to avoid many potential obstacles.