In a cutthroat market, where the competition is constantly on the attack to break into your market share, implementing a project-based system can give your organisation the necessary tools to be more efficient and agile.

However, rapidly changing consumer demands, technologies and other factors make it ever more difficult to generate a strategic advantage from projects, let alone develop one. Also since a large organisation can easily end up having to manage multiple projects at the same time, the new management paradigm can appear too complex.

What your company really needs is the expertise that can guide you starting from conception and planning, down through procurement and execution in order to maximise whatever resources you have. Each move must be well thought out so that there are clear goals and objectives as well as methods to achieve them.

Programme Management

Are you running multiple projects pointing to an overall strategic direction? Then you’ll need more than just a “scaled-up” version of project management to make sure every component’s work effort is well coordinated to achieve your enterprise’s desired outcomes.

Through our expertise in programme management, we’ll work with your stakeholders, executives and clients to achieve the following:

  • Design a well-articulated management structure and clearly define decision-making roles & responsibilities – This will ensure decisions are made rapidly with zero to minimal overlapping issues and to promote a unified, well-synchronised advance towards the common objective.
  • Set objectives then make sure they are met by guiding your key personnel in coordinating activities across projects.
  • Design or utilise existing financial models such that they adhere to your enterprise’s financial policies.
  • Develop procedures for reporting expenditures specific to the programme.
  • Establish the programme infrastructure, including
    • The appropriate technical environment and tools (e.g. hardware, software, communication, and other IT-related items)
    • IT staff and administrators
  • Evaluate your enterprise’s current IT architecture to determine whether it will suffice to achieve your objectives. If it doesn’t, propose options you can take to meet what is required.
  • Plan out activities that should take place in different levels in the organisation.
  • Implement a periodic review of the programme progress as well as of interim results to ensure everything is aligned with the strategic outcome.

Programme and Project Reviews

Whether we’ve helped you set up your programme or you did it on your own, time will come when you’ll need to know whether everything is going as planned. If it appears like the entire programme is going smoothly, chances are, something’s going awfully wrong somewhere. Remember, even the most well-planned projects and programmes are still under the mercy of unforeseen variables.

We’ve got highly specialised reviews for either projects or an entire programme. We’ll be able to provide you answers to questions like:

  • Are all projects aligned with the programme’s intended direction?
  • Are the people working on your projects as focused with the business rationale as they have been with meeting deadlines and utilising resources?
  • Where are your risks and exposures? How can they be remedied?
  • Is the project viable at all?

We understand how your staff would want to function normally as quickly as possible. Rest assured, our programme and project reviews are conducted swiftly and efficiently so that both interruptions and oversights are brought to a minimum.

After we’re done, you can expect a detailed quantitative assessment of your programme and/or projects’ status.

Basically, we’re not here to find mistakes; we’re here to help you find ways to correct them. If a project rescue is required, we’ll be the first to lend a hand.

Project Rescue

Believe it or not, many of our clients approached us not before or during their project’s planning stages. But rather, after having gone through sloppy execution, when they end up losing control. In other words, we’re usually at the receiving end of the distress signal, after they’ve punched the panic button.

While obviously this isn’t the ideal time to seek the aid of any expert because it means you’ve incurred unnecessary losses already, all is not yet lost. If the appropriate remedial actions are taken in a timely manner, you can still achieve highly acceptable end results.

In fact, in most of our experiences with project rescue operations, we’ve been able to put projects back on track – just the way the planners wanted them to be. We’ll also help you devise airtight strategies to prevent your project from going astray again.

At the end of our project rescue,

  • You’ll regain complete control
  • Milestones will be reached as planned
  • Requirements will be accomplished, and
  • The project will be realigned with ideal business directions

Project Governance Processes

Constructing a firm underlying structure is essential in any organisation. So before we’ll institute project management, we’ll do the following first.

  • Set up a PMO or Project Management Office to ensure, among others, that
    • Utilisation of facilities, budgets, technical support and other resources will be well coordinated
    • Work products can be tracked and reviewed
    • Issues regarding methodology and processes will be given appropriate attention
    • Training can be organised
    • Project management discipline be instilled in the IT department
  • Establish a steering committee to oversee the implementation of IT and business strategies
  • Fill up slots for a project manager, IT executive and a business sponsor and define the roles of each
  • Infuse project management practices to all affected units of the enterprise

Establishing PMOs, steering committees and other management structures is the easy part. Many organisations spend so much in order to create the structures related to project management, only to find out later that the effort has been all for naught. That’s why we won’t end there. Our objectives will therefore include the following:

  • To plant and cultivate an environment appreciative of project governance i.e. one that does not project it as just a bunch of bureaucratic processes and protocols.
  • To establish an organisational culture that starts at the top.
  • To make everyone involved understand that the power of project governance still lies in the hands of those who will ultimately implement it.

A project-driven enterprise is never propelled by a single project. Since multiple projects require a more complex governing structure, you’ll need to understand the intricacies of programme management.

Check our similar posts

Virtualisation

Using an IT solution that can provide the fastest (but still reliable) disaster recovery process is essential for the success of any business continuity plan. Although virtualisation is still considered leading edge technology by many business continuity specialists, it definitely brings a promise that, once fulfilled, can result in the cheapest, fastest, and most comprehensive solution for business continuity.

One great advantage of virtualisation over traditional BC (Business Continuity) methods is the relatively cheaper cost needed to achieve a certain level of business continuity assurance. Thus, more companies will find it easier to reach their required minimum for BC assurance. By contrast, some BCPs (Business Continuity Plan) based on a physical environment require companies to invest more than what they are willing to in order to reach the same minimum level of assurance.

Virtual machines, which can already encapsulate your operating systems and their corresponding applications, can be transported as a file from one machine running a compatible hypervisor to another. This makes the business continuity tasks of backup, replication, and restoration simpler and faster.

As of 2008, about 54% of IT professionals in Europe were willing to implement virtualisation within a maximum of two years. Furthermore, the expected compound annual growth rate of installed virtualised servers from 2008 to 2012 is already pegged at 33%.

If you want your organisation to take advantage of the benefits of this revolutionary technology, we’d be more than willing to help you discover what it can do for you. Then once you decide to make that transition to virtualisation, we can guide you every step of the way.

  • As not all applications are suited for virtualisation (e.g. some are too demanding on I/O and memory access), we’ll start by reviewing your entire IT system to see which portions can be implemented on a virtualized environment.
  • Using virtualisation and replication, we can conduct disaster recovery tests using up-to-date data without interrupting operations in your main IT site. Running these tests will increase your team’s preparedness and will allow you to discover possible weak points.
  • Provide a simple but comprehensive protection and backup system that encapsulates not only data, but also system configurations and application installations. This kind of setup allows for faster and easier disaster recovery operations. Because of these same characteristics, you can enjoy zero downtime while performing scheduled maintenance operations.
  • Since virtual machines are hardware-independent and transparent to operating systems, we can help you run a mix of legacy and new systems as well as open source and proprietary systems, allowing for more flexibility in your BCP budgeting.

We can also assist you with the following:

Contact Us

  • (+353)(0)1-443-3807 – IRL
  • (+44)(0)20-7193-9751 – UK
FUJIFILM Cracks the Energy Code

FUJIFILM was in trouble at its Dayton, Tennessee plant in 2008 where it produced a variety of speciality chemicals for industrial use. Compressed-air breakdowns were having knock-on effects. The company decided it was time to measure what was happening and solve the problem. It hoped to improve reliability, cut down maintenance, and eliminate relying on nitrogen for back-up (unless the materials were flammable).

The company tentatively identified three root causes. These were (a) insufficient system knowledge within maintenance, (b) weak spare part supply chain, and (c) generic imbalances including overstated demand and underutilised supply. The maintenance manager asked the U.S. Department of Energy to assist with a comprehensive audit of the compressed air system.

The team began on the demand side by attaching flow meters to each of several compressors for five days. They noticed that – while the equipment was set to deliver 120 psi actual delivery was 75% of this or less. They found that demand was cyclical depending on the production phase. Most importantly, they determined that only one compressor would be necessary once they eliminated the leaks in the system and upgraded short-term storage capacity.

The project team formulated a three-stage plan. Their first step would be to increase storage capacity to accommodate peak demand; the second would be to fix the leaks, and the third to source a larger compressor and associated gear from a sister plant the parent company was phasing out. Viewed overall, this provided four specific goals.

  • Improve reliability with greater redundancy
  • Bring down system maintenance costs
  • Cut down plant energy consumption
  • Eliminate nitrogen as a fall-back resource

They reconfigured the equipment in terms of lowest practical maintenance cost, and moved the redundant compressors to stations where they could easily couple as back-ups. Then they implemented an online leak detection and repair program. Finally, they set the replacement compressor to 98 psi, after they determined this delivered the optimum balance between productivity and operating cost.

Since 2008, FUJIFILM has saved 1.2 million kilowatt hours of energy while virtually eliminating compressor system breakdowns. The single compressor is operating at relatively low pressure with attendant benefits to other equipment. It is worth noting that the key to the door was measuring compressed air flow at various points in the system.

ecoVaro specialises in analysing data like this on any energy type.?

Contact Us

  • (+353)(0)1-443-3807 – IRL
  • (+44)(0)20-7193-9751 – UK
ESOS What is the Truth?

When the UK administration introduced its ESOS Energy Savings Opportunity Scheme reactions from business people followed a familiar theme.

  • Do nothing it will go away
  • The next Westminster will drop this
  • Another stealth tax. I don’t have time for this
  • Give the problem to admin and tell them to fix it

ecovaro decided to share three facts with you. These are

(1) ESOS is not a government money spinner

(2) all major political parties support it, and

(3) it is a cost-effective way to put money back in your pocket while feeling better about what business pumps into the environment.

Four More ESOS Facts

1. You Cannot Give the Problem to Admin ? Energy is technical. The lead belongs with your operations staff because they understand how your systems work. Some things are best outsourced though. ecovaro is here to help.

2. ESOS is Not Going to Go Away ? A company inside the regulation net must submit its first report by 6 December 2015. Non-compliance risks the following penalties:

  • ?5,000 for not maintaining adequate records
  • ?50,000 for not completing the assessment
  • ?50,000 for making a false or misleading statement

3. The Employee Count is the Annual Average – The employment criteria (unlike balance sheet and turnover) is the monthly average of full and part-time employees taken across the full financial year. The fact you have <250 employees in December 2015 when the first report is due does not necessarily let you off the hook.

4. The 6 December 2014 Report is No Big Deal ? When you think about it the administration is hardly likely to spend years wading through 9,000 detailed company energy plans. It has no authority to comment in any case. All that is required is for a senior director to confirm reading the document, and a lead assessor to agree it complies with the law.

Does this mean that ESOS is a damp squib? We do not think so, although some firms may take the low road. ecovaro believes the financial benefits will carry the process forward, and that the imperative to make the world a better place will do the rest.