The Child at Work: Fun Team Builds with LEGO SERIOUS PLAY

There is a child just below the surface in all of us. When were kids, adults lopped off the sharp bits that intruded into their ?genteel? society. Schools, to their everlasting shame sanded away our unique free spirits, as they stuck us into uniforms and imposed a daily classroom discipline. We received badges and prizes if we obeyed, and strict sanctions when we did not. This produced a generation of middle-age managers who no longer know how to play.

Life can be so deadly serious ?

Things work pretty much the same in business. Life is deadly serious. If we want to keep our jobs, we must deliver on the bottom line in our departments. There is little time for fun outside the Christmas party, when we may, within the limits of decorum engage in activity for enjoyment and recreation, rather than a serious or practical purpose.

Team builds (and strategic planning sessions) can be deadly boring affairs that proceed down narrow funnels defined by human resource facilitators. No matter how hard HR they may try, the structural hierarchy will remain intact, unless they find a way to set it aside during the program. Injecting fun into the occasion liberates independent thought, and this is why.

? But not for a little child at play

Next time you dine out at a branded family restaurant, select a seat that allows you observe the kiddies? play zone. Notice how inventive children become, when the family hierarchy is not there to tell them what to do (although parents may try from the wrong side of the soundproof glass). The ?serious play? side of fun team-builds aims to liberate managers by releasing their child for the duration. Shall we dig a little deeper into this and discover the dynamics?

Many of us have less than perfect oral communication skills. This is one of the great impediments to modern business meetings. We may not have sufficient time to formulate our thoughts for them to remain relevant when we speak. When we express them, we sense the group?s impatience for us to hurry up, so other members can have their opportunity to contribute.

Sharing better thinking with LEGO? bricks

Most of us feel an urge to click the brightly coloured plastic bricks together that carpenter Ole Kirk Christiansen released into a war-weary world in 1949. The basic kit is a great leveller because the blocks are all the same, and the discriminators are the colours and the power of our imagination. Watching a free-form LEGO builder in action is equally fascinating, as we wonder ?what they will do next? and ?what is happening in their mind.?

Examples of LEGO Serious PLAY in action

Instead of asking team members to describe themselves in a minute, a LEGO? SERIOUS PLAY? facilitator may gather them around a table piled high with LEGO bricks instead, and ask them to each build a model of themselves. The atmosphere is informal with interaction and banter encouraged. It is still serious play though, as team members get to know each other, and their own personalities better

The system is equally effective in strategic sessions, where the facilitator provides specially selected building blocks for the team to experiment with as they learn to listen, and share. This enables them to deconstruct a problem into its component parts, and share solutions regardless of seniority, culture, and communication skills.

Creating problem- and solution-landscapes three dimensionally this way, enables open conversations that keep the focus on the problem. Participants at these team builds do not only reach effective consensus faster. They are also busy building better communication skills as they do.

Contact Us

  • (+353)(0)1-443-3807 – IRL
  • (+44)(0)20-7193-9751 – UK

Check our similar posts

FUJIFILM Cracks the Energy Code

FUJIFILM was in trouble at its Dayton, Tennessee plant in 2008 where it produced a variety of speciality chemicals for industrial use. Compressed-air breakdowns were having knock-on effects. The company decided it was time to measure what was happening and solve the problem. It hoped to improve reliability, cut down maintenance, and eliminate relying on nitrogen for back-up (unless the materials were flammable).

The company tentatively identified three root causes. These were (a) insufficient system knowledge within maintenance, (b) weak spare part supply chain, and (c) generic imbalances including overstated demand and underutilised supply. The maintenance manager asked the U.S. Department of Energy to assist with a comprehensive audit of the compressed air system.

The team began on the demand side by attaching flow meters to each of several compressors for five days. They noticed that – while the equipment was set to deliver 120 psi actual delivery was 75% of this or less. They found that demand was cyclical depending on the production phase. Most importantly, they determined that only one compressor would be necessary once they eliminated the leaks in the system and upgraded short-term storage capacity.

The project team formulated a three-stage plan. Their first step would be to increase storage capacity to accommodate peak demand; the second would be to fix the leaks, and the third to source a larger compressor and associated gear from a sister plant the parent company was phasing out. Viewed overall, this provided four specific goals.

  • Improve reliability with greater redundancy
  • Bring down system maintenance costs
  • Cut down plant energy consumption
  • Eliminate nitrogen as a fall-back resource

They reconfigured the equipment in terms of lowest practical maintenance cost, and moved the redundant compressors to stations where they could easily couple as back-ups. Then they implemented an online leak detection and repair program. Finally, they set the replacement compressor to 98 psi, after they determined this delivered the optimum balance between productivity and operating cost.

Since 2008, FUJIFILM has saved 1.2 million kilowatt hours of energy while virtually eliminating compressor system breakdowns. The single compressor is operating at relatively low pressure with attendant benefits to other equipment. It is worth noting that the key to the door was measuring compressed air flow at various points in the system.

ecoVaro specialises in analysing data like this on any energy type.?

Contact Us

  • (+353)(0)1-443-3807 – IRL
  • (+44)(0)20-7193-9751 – UK
ESOS Facts on a Page

The UK?s ESOS energy saving program stands for ?Energy Savings Opportunity Scheme?. Its purpose is to reduce demand – and hence fossil-based pollution at both ends of the supply chain. It currently applies to large UK companies only. However its guidelines are also valuable input to smaller firms voluntarily going greener.

The program threshold is 250 employees and / or turnover or at least ?UK50 million. This affects approximately 9,000 UK firms, with others below the threshold wondering whether the government plans to lower it. In essence, ESOS requires that qualifying businesses complete comprehensive audits of energy use and opportunities at least every fourth year.

The plan is carrot and stick. Compliant companies will probably uncover significant savings when they stop and measure. They may even unearth carbon credits they can sometime exchange for cash. Reactionary firms who try to duck the issue will feel Her Majesty?s wrath through stiff penalties. In time, they may find it harder to attract investors. If ESOS affects your company, then the wise thing could be complying by the first deadline of 5 December 2015.

To do so, you must conduct an energy audit and report it to the UK Environment Agency. This comprises

  1. Measuring total energy use across processes, transport and facilities
  2. Pie charting 90% of this to identify areas that are energy intensive
  3. Singling out cost-effective energy-saving projects in high use areas
  4. Submitting your report to the Environment Agency ahead of the deadline

ecoVaro recommends affected companies do not leave this to the last minute. While having ISO 50001 may exempt some from ESOS, the regulations are far from straightforward and it will take months to reach complete clarification. We would like to suggest a more balanced approach.

ESOS is a wonderful incentive to save energy costs while contributing to a better future for the kids. The Energy Savings Opportunity Scheme is precisely that. The cost of energy has crept up on us to the extent that we have to do something, government or no government.

Measuring energy consumption is as simple as installing meters at critical points in the flow, and you probably have many of them anyway. Once you have your data you no longer have to crunch the numbers. ecoVaro can do this for you and return the result in the form of handy graphs and spreadsheets.

Scrumming Down to Complete Projects

Everybody knows about rugby union scrums. For our purposes, perhaps it is best to view them as mini projects where the goal is to get the ball back to the fly-half no matter what the opposition does. Some scrums are set pieces where players follow planned manoeuvres. Loose / rolling scrums develop on the fly where the team responds as best according to the situation. If that sounds to you like software project management then read on, because there are more similarities?.

Isn’t Scrum Project Management the Same as Agile?

No it’s not, because Scrum is disinterested in customer liaison or project planning, although the team members may be happy to receive the accolades following success. In the same way that rugby players let somebody else decide the rules and arrange the fixtures, a software Scrum team just wants the action.

Scrum does however align closely ? dare I say interchangeably with Agile?s sprints. Stripping it of all the other stages frees the observer up to analyse it more closely in the context of a rough and tumble project, where every morning can begin with a backlog of revised requirements to back fit.

The 3 Main Phases of a Scrum

A Scrum is a single day in the life of a project, building onto what went before and setting the stage for what will happen the following day. The desired output is a block of component software that can be tested separately and inserted later. Scrumming is also a useful technique for managing any project that can be broken into discreet phases. The construction industry is a good example.

Phase 1 – Define the Backlog. A Scrum Team?s day begins with a 15 minute planning meeting where team members agree individual to-do lists called ?backlogs?.

Phase 2 – Sprint Towards the Goal. The team separates to allow each member to complete their individual lines of code. Little or no discussion is needed as this stage.

Phase 3 – Review Meeting. At the end of each working day, the team reconvenes to walk down what has been achieved, and check the interconnected functionality.

The 3 Main Phases of a Scrum ? Conclusions and Thoughts

Scrum is a great way to liberate a competent project team from unnecessary constraints that liberate creativity. The question you need to ask yourself as manager is, are you comfortable enough to watch proceedings from the side lines without rushing onto the field to grab the ball.

Contact Us

  • (+353)(0)1-443-3807 – IRL
  • (+44)(0)20-7193-9751 – UK

Ready to work with Denizon?