2015 ESOS Guidelines Chapter 2 – Deadlines and Status Changes

The ESOS process is deadline driven and meeting key dates is a non-negotiable. The penalties for not complying / providing false or misleading information are ?50,000 each. Simply not maintaining adequate records could cost you ?5,000. The carrot on the end of the stick is the financial benefits you stand to gain.

Qualifying for inclusion under the ESOS umbrella depends on the status of your company in terms of employee numbers, turnover and balance sheet on 31 December 2014. Regardless of whether you meet the 2014 threshold or not, you must reconsider your situation on 31 December 2018, 2022 and 2026.

Compliance Period Qualification Date Compliance Period Compliance Date
1 31 December 2014 From 17 July 2014* to 5 December 2015 5 December 2015
2 31 December 2018 From 6 December 2015 to 5 December 2019 5 December 2019
3 31 December 2022 From 6 December 2019 to 5 December 2023 5 December 2023
4 31 December 2026 From 6 December 2023 to 5 December 2027 5 December 2027

Notes:

1. The first compliance period begins on the date the regulations became effective

2. Energy audits from 6 December 2011 onward may go towards the first compliance report

Changes in Organisation Status

If your organisation status changes after a qualification date when you met compliance thresholds, you are still bound to complete your ESOS assessment for that compliance period. This is regardless of any change in size or structure. Your qualification status then remains in force until the next qualification date when you must reconsider it.

Check our similar posts

Virtualisation

Using an IT solution that can provide the fastest (but still reliable) disaster recovery process is essential for the success of any business continuity plan. Although virtualisation is still considered leading edge technology by many business continuity specialists, it definitely brings a promise that, once fulfilled, can result in the cheapest, fastest, and most comprehensive solution for business continuity.

One great advantage of virtualisation over traditional BC (Business Continuity) methods is the relatively cheaper cost needed to achieve a certain level of business continuity assurance. Thus, more companies will find it easier to reach their required minimum for BC assurance. By contrast, some BCPs (Business Continuity Plan) based on a physical environment require companies to invest more than what they are willing to in order to reach the same minimum level of assurance.

Virtual machines, which can already encapsulate your operating systems and their corresponding applications, can be transported as a file from one machine running a compatible hypervisor to another. This makes the business continuity tasks of backup, replication, and restoration simpler and faster.

As of 2008, about 54% of IT professionals in Europe were willing to implement virtualisation within a maximum of two years. Furthermore, the expected compound annual growth rate of installed virtualised servers from 2008 to 2012 is already pegged at 33%.

If you want your organisation to take advantage of the benefits of this revolutionary technology, we’d be more than willing to help you discover what it can do for you. Then once you decide to make that transition to virtualisation, we can guide you every step of the way.

  • As not all applications are suited for virtualisation (e.g. some are too demanding on I/O and memory access), we’ll start by reviewing your entire IT system to see which portions can be implemented on a virtualized environment.
  • Using virtualisation and replication, we can conduct disaster recovery tests using up-to-date data without interrupting operations in your main IT site. Running these tests will increase your team’s preparedness and will allow you to discover possible weak points.
  • Provide a simple but comprehensive protection and backup system that encapsulates not only data, but also system configurations and application installations. This kind of setup allows for faster and easier disaster recovery operations. Because of these same characteristics, you can enjoy zero downtime while performing scheduled maintenance operations.
  • Since virtual machines are hardware-independent and transparent to operating systems, we can help you run a mix of legacy and new systems as well as open source and proprietary systems, allowing for more flexibility in your BCP budgeting.

We can also assist you with the following:

Contact Us

  • (+353)(0)1-443-3807 – IRL
  • (+44)(0)20-7193-9751 – UK
Which Services to Share?

It often makes sense to pool resources. Farmers have been doing so for decades by collectively owning expensive combine harvesters. France, Germany, the United Kingdom and Spain have successfully pooled their manufacturing power to take on Boeing with their Airbus. But does this mean that shared services are right in every situation?

The Main Reasons for Sharing

The primary argument is economies of scale. If the Airbus partners each made 25% of the engines their production lines would be shorter and they would collectively need more technicians and tools. The second line of reasoning is that shared processes are more efficient, because there are greater opportunities for standardisation.

Is This the Same as Outsourcing?

Definitely not! If France, Germany, the United Kingdom and Spain has decided to form a collective airline and asked Boeing to build their fleet of aircraft, then they would have outsourced airplane manufacture and lost a strategic industry. This is where the bigger picture comes into play.

The Downside of Sharing

Centralising activities can cause havoc with workflow, and implode decentralised structures that have evolved over time. The Airbus technology called for creative ways to move aircraft fuselages around. In the case of farmers, they had to learn to be patient and accept that they would not always harvest at the optimum time.

Things Best Not Shared

Core business is what brings in the money, and this should be tailor-made to its market. It is also what keeps the company afloat and therefore best kept on board. The core business of the French, German, United Kingdom and Spanish civilian aircraft industry is transporting passengers. This is why they are able to share an aircraft supply chain that spun off into a commercial success story.

Things Best Shared

It follows that activities that are neither core nor place bound – and can therefore happen anywhere ? are the best targets for sharing. Anything processed on a computer can be processed on a remote computer. This is why automated accounting, stock control and human resources are the perfect services to share.

So Case Closed Then?

No, not quite. ?Technology has yet to overtake our humanity, our desire to feel part of the process and our need to feel valued. When an employee, supplier or customer has a problem with our administration it’s just not good enough to abdicate and say ?Oh, you have to speak to Dublin, they do it there?.

Call centres are a good example of abdication from stakeholder care. To an extent, these have ?confiscated? the right of customers to speak to speak directly to their providers. This has cost businesses more customers that they may wish to measure. Sharing services is not about relinquishing the duty to remain in touch. It is simply a more efficient way of managing routine matters.

Becoming Nimble the Agile Project Management Way

In dictionary terms, ?agile? means ?able to move quickly and easily?. In project management terms, the definition is ?project management characterized by division of tasks into short work phases called ?sprints?, with frequent reassessments and adaptation of plans?. This technique is popular in software development but is also useful when rolling out other projects.

Managing the Seven Agile Development Phases

  • Stage 1: Vision. Define the software product in terms of how it will support the company vision and strategy, and what value it will provide the user. Customer satisfaction is of paramount value including accommodating user requirement changes.
  • Stage 2: Product Roadmap. Appoint a product owner responsible for liaising with the customer, business stakeholders and the development team. Task the owner with writing a high-level product description, creating a loose time frame and estimating effort for each phase.
  • Stage 3: Release Plan. Agile always looks ahead towards the benefits that will flow. Once agreed, the Product Road-map becomes the target deadline for delivery. With Vision, Road Map and Release Plan in place the next stage is to divide the project into manageable chunks, which may be parallel or serial.
  • Stage 4: Sprint Plans. Manage each of these phases as individual ?sprints?, with emphasis on speed and meeting targets. Before the development team starts working, make sure it agrees a common goal, identifies requirements and lists the tasks it will perform.
  • Stage 5: Daily Meetings. Meet with the development team each morning for a 15-minute review. Discuss what happened yesterday, identify and celebrate progress, and find a way to resolve or work around roadblocks. The goal is to get to alpha phase quickly. Nice-to-haves can be part of subsequent upgrades.
  • Stage 6: Sprint Review. When the phase of the project is complete, facilitate a sprint review with the team to confirm this. Invite the customer, business stakeholders and development team to a presentation where you demonstrate the project/ project phase that is implemented.
  • Stage 7: Sprint Retrospective. Call the team together again (the next day if possible) for a project review to discuss lessons learned. Focus on achievements and how to do even better next time. Document and implement process changes.

The Seven Agile Development Phases ? Conclusions and Thoughts

The Agile method is an excellent way of motivating project teams, achieving goals and building result-based communities. It is however, not a static system. The product owner must conduct regular, separate reviews with the customer too.